한국 AAV 종합지원센터

to top 통합 매뉴얼 다운로드
  1. Home
  2. Equipment Support
  3. Equipment Overview

Equipment Overview

Explore the functions and specifications of the equipment operated by our center at a glance.

Available

AAV Vertiport for Test Flight

A dedicated vertiport established for AAV test flights, providing safe takeoff and landing as well as diverse demonstration flight environments based on advanced infrastructure.

pause
  • Equipment Details

    1. Key Feature

      • Location : 1521-1, Jawol-ri, Jawol-myeon, Ongjin-gun
      • Establishment of flight demonstration infrastructure within a Special Regulatory Free Zone to preempt the future mobility industry
      • Airspace Area : Total 333㎢
      • Airspace Altitude : Below 300m MSL
      1. Flight Test Infrastructure and Airspace Detail Image 6Projected View at Building Completion
      2. Flight Test Infrastructure and Airspace Detail Image 7Jawoldo Takeoff and Landing Site
      1. Flight Test Infrastructure and Airspace Detail Image 1View of Jawoldo Takeoff and Landing Site
      2. Flight Test Infrastructure and Airspace Detail Image 2Design Drawing of Jawoldo Takeoff and Landing Site
    2. Strengths of Ongjin-gun Special Regulatory Free Zone

      • AAV Unmanned Flight-Enabled Airspace
      • Weather Conditions Most Similar to Commercial Operation Routes
      • Optimal Location for Maritime Flight Operations
      • Closest Airspace to Multiple AAV Development Companies
      • Specialized for Logistics (CAV) Delivery Testing and Demonstration
      • Provision of Safe Test Flights and Demonstration Environment through Control Services : Currently using a monitoring system
      • Establishment and Provision of Routes by Test and Demonstration Flight Stages
      1. Flight Test Infrastructure and Airspace Detail Image 3AAV Demonstration Route Map
      2. Flight Test Infrastructure and Airspace Detail Image 4Jawoldo AAV Takeoff and Landing System Control & Monitoring System
    3. Specification

      • Vertiport W 27m x L 27m (TLOF : 10m, FATO : 20m, Safety Area : 27m)
        Taxiway W 10m x L 25m
        Apron W 20m x L 25m, Parking for 2 Aircraft
        Integrated Monitoring System, Office, MRO W 3m x L 20m
        AMOS Weather Observation System
        Aviation Lighting Prepared for Night Operations and Adverse Weather Conditions
        Installed Facilities
        • Charging System, Security Facilities, Emergency Power Generation Facilities
        • Weather Observation System, MRO Facilities
        • Monitoring System (Future Control System Planned)
View List
  1. prev
  2. pause
  3. next
  • footer logo 04 인천광역시
  • footer logo 02 산업통상자원부
  • footer logo 01 인천테크노파크
  • footer logo 05 인천파브도심
  • footer logo 07 인하대
  • footer logo 08 인하공전
  • footer logo 06 한국건설
  • footer logo 03 한국산업기술진흥원